Process alternatives and flowsheeting: Difference between revisions

From processdesign
Jump to navigation Jump to search
Line 26: Line 26:
==Location Factors==
==Location Factors==
Because of the abundance of chemical engineering plants in the U.S Gulf Coast, it is often the standard for plant and equipment cost. Cost of plant construction will differ based on:
Because of the abundance of chemical engineering plants in the U.S Gulf Coast, it is often the standard for plant and equipment cost. Cost of plant construction will differ based on:
(*) Construction Infrastructure
* Construction Infrastructure
(*) Labor costs
* Labor costs
(*) Transportation costs
* Transportation costs
(*) Tax Rates
* Tax Rates
(*) Exchange Rates
* Exchange Rates


==Estimating Offsite Capital Costs==
==Estimating Offsite Capital Costs==

Revision as of 05:18, 10 February 2014


Authors: Alex Chandel, Eric Jiang, Minwook Kim, Todor Kukushliev, William Lassman (ChE 352 in Winter 2014)

Steward: David Chen, Fengqi You

Date Presented: 2/9/2014



Introduction

Components of Capital Cost

Accuracy and purpose of Capital Cost Estimates

Order of Magnitude Estimates

Estimating Purchased Equipment Costs

Estimating Installed Costs: The Factorial Method

Cost Escalation

Location Factors

Because of the abundance of chemical engineering plants in the U.S Gulf Coast, it is often the standard for plant and equipment cost. Cost of plant construction will differ based on:

  • Construction Infrastructure
  • Labor costs
  • Transportation costs
  • Tax Rates
  • Exchange Rates

Estimating Offsite Capital Costs

Computer Tools for Cost Estimating

Validity of Cost Estimates

References

1. Gavin Towler and Ray Sinnott, Chapter 7 – Capital Cost Estimating, Chemical Engineering Design, 2nd Ed., edited by Gavin Towler and Ray Sinnott, Butterworth-Heinemann, Boston, 2013, Pages 307–354, ISBN 9780080966595, http://www.sciencedirect.com/science/article/pii/B9780080966595000079.